Our plans are to restore the Church of the Intercession of the Most Holy Theotokos and organize a museum of ethnography and painting on the basis of this building.

We have already carried out a topographic survey, installed a fence and developed a draft and detailed design together with the diocesan architect. Now 150 cubic meters of larch are being harvested for reconstruction.

Results:
A topographic survey was carried out and a fence was installed (3.5 million tenge)
A draft and working design project were developed jointly with the diocesan architect (4.5 million tenge)
150 cubic meters of larch for reconstruction work (7.5 million tenge)

Figures:
2020-2021 - design, 
2022 - start of reconstruction work,  
Budget: 151 million tenge