Our plans for 2022-2023 include the construction of a cottage village in Katon-Karagay.
The goal of the project is to create conditions for attracting people with rich human capital. We have already identified land plots for the cottage village and developed a draft design.
Results: Land plots have been determined. A preliminary design has been developed (2 million tenge). The concept includes a territory zoning scheme, an architectural solution, layout and interior, 3d visualization and functional diagrams.
Cost: to be determined based on the development of design and estimate documentation
Figures: Deadlines: 2019 -2021 preparatory stage, 2022 - development of design and estimate documentation, 2023 - start of construction work.