Katon-Karagay
Ecology

Fencing of the solid waste landfill in the Ulken Naryn village

In 2019, we fenced off a 4-hectare solid waste landfill in the village of Ulken Naryn.

There we installed a mesh and mounting wire so that the garbage would not fly outside the landfill. Also, 42 pillars were restored and the territory along the outer perimeter was cleared for the installation of a fence.

2019
2 021 834 tenge